GRP1 - CRL Wet Glaze Pump and Accessories
C.R.Laurence
 YOUR ACCOUNT               VIEW CART                SIGN INSIGN OFF

Catalog Number: GRP1


  • Portable, Lightweight, Compact Delivery System for Expansion Cement

  • Dramatically Increases Speed of Application

  • On/Off Control at Point of Delivery
  • Quick and Easy Hose Replacement

  • When CRL decided to enter the Glass Rail market, we went at it in typical CRL fashion and asked the question "How can we improve on the antiquated processes and equipment currently being used to benefit our customers"? So when it came time to look at the way that the expansion cement was being delivered to the Base Shoe, we knew we had to find a better way. We did just that by developing our Wet Glaze Pump and Accessories.



    CRL Wet Glaze Pump and Accessories


     


    Other Products/Finishes:

    CATALOG NUMBER DESCRIPTION
    GRP2 CRL Replacement Hose Kit for the GRP1

    Catalog Number:GRP1
    Also Available in These Catalogs:
    CRL63R Architectural Railing Systems, PAGE 121R
    HR18 Architectural Railing Systems 2018, PAGE 131B
    CRL73R Tools, Machinery, and Equipment, PAGE 300K
    CRL93A Architectural Railings, PAGE HR273
    CRL03 Sealants, Adhesives, and Fasteners, PAGE N286
    Ship Via:Can Ship UPS
    Shipping Weight:25 lb (11.34kg)

    The CRL Wet Glaze Pump has been designed to reduce the labor associated with the application of expansion cement to Hand Rail Base Shoe, and to improve the quality, efficiency, and effectiveness of the final assembly of the Base Shoe and glass. The Wet Glaze Pump not only increases speed of application dramatically, it also offers superior control over the flow rate and delivery location than that of manual applicators.

    This unique delivery system utilizes a pair of rollers fixed to a rotating disk that squeezes the cement through flexible tubing. Since the tubing is the only thing to come in contact with the cement, there are no seals to leak, giving you a virtually maintenance free pump.

    Simply mix your cement in the mixing bucket, insert the end of the Inlet Hose into the mixture, and depress the handy ON/OFF Switch located on the Delivery Nozzle. The Pump will immediately start to move the cement through the hose. Purge any excess water from the hose and release the ON/OFF Switch. You are now ready-to-start pumping cement into the Base Shoe at a rate of 11' (3.3 m) per minute.

    Pump Kit Includes: One Pump with Hoses, One Nozzle, One Momentary ON/OFF Switch, Two 5 Gallon Buckets, Two Measuring Pitchers, One Plastic Scoop, One Mixing Spoon, One GFC1 15A Ground Fault Interrupt Device, and One GRP2 Replacement Hose Kit.

    NOTE: Clamp and Alignment Fixture not included.


    Most shipping weights are approximate and have not been verified. If the exact weight is needed in order to determine shipping costs, and shipping costs are required in order for you to complete your order, please request this prior to submitting your order by contacting CRL Customer Service. Product images shown are of the actual product or a close representation. ColorsColours can vary depending on your computer's video card and on how your monitor's colorcolour is adjusted.