Preparation: Surfaces must be clean, dry, and structurally sound. Temperature must be above 40°F (5°C). One of the surfaces to be bonded must be porous. Cabinets and Countertops: Apply 1/4" (6 mm) bead to contact areas. Press parts into place. Mechanical fasteners must be used for wall cabinets. Panels to Furring Strips or Studs: Panels must be conditioned to room temperature for 24 hours prior to installation. Apply a 1/4" (6 mm) zigzag bead to each strip or stud. Position panel so edges meet at stud center. Use nails or screws as required. Applies with a standard caulking gun. Clean Up: Use water for wet adhesive. Use mineral spirits or adhesive remover for dry adhesive.
NOTE: Liquid Nails® is not recommended for styrofoam, foam, plastic, marble or mirrors. Liquid Nails® is VOC Compliant, so it can be sold in areas with Air Quality Control Restrictions. Children and Schools GREENGUARD® Indoor Air Quality Certified. Exceeds ASTM C-557 specifications.